Fire Safety & AC Piping Installation at Darin Tower / Meghna Bank

Project Information

  • Client:
  • Location:
  • Category:
  • Completion Date:
  • Status: Completed ✅

Fire Pipe, Valve, AC Piping & Duct Installation at Darin Tower | Bhai Bhai Engineering

Bhai Bhai Engineering successfully completed the Supply and Installation of Fire Pipe, Valves, Accessories, AC Piping, and Duct Installation Work at Darin Tower / Meghna Bank, located in Gulshan-2, Dhaka. This project involved advanced fire safety infrastructure, HVAC piping, and ducting solutions to ensure security, durability, and long-term operational efficiency.

1. Fire Pipe Installation:  1). Fire-rated pipes  2). High-quality fittings  3). Pressure testing  4). Vertical & horizontal line installation  5). Long-term corrosion protection

2. Valve & Accessories Installation: 1). Gate valves  2). Check valves  3). Butterfly valves  4). Flow switches, pressure gauges  5). Fire pump room connectivity

3. AC Piping & Ducting: 1). Copper piping installation  2). GI/SS duct fabrication  3). Duct insulation  4). HVAC air balancing  5). Commercial-grade AC line setup

 

Importance of This Work Type for Different Sectors

Shopping Malls: 1). Mandatory fire safety compliance  2). Prevents major accidents  3). Ensures smooth HVAC performance

Businesses & Corporate Offices: 1). Safety of workforce and valuables  2). Reduces operational downtime 3). Maintains indoor comfort

Industries: 1). Controls overheating risks  2). Ensures environment stability for machines

Banks: 1). Fire safety is critical for asset protection  2). HVAC maintains temperature-sensitive equipment

Government Offices: 1). Needed for public safety  2). Helps maintain compliance with Bangladesh National Building Code (BNBC)

Institutes: 1). Ensures safety of students/staff  2). Improves air quality and comfort

 

Why Bhai Bhai Engineering Is Best for This Work Type

1). 12+ years experience in fire safety & HVAC works  2).Certified installation experts  3). Use of original, industry-grade materials  4). Timely project delivery  5). Zero-compromise on safety standards  6). Strong after-sales support  7). Trusted by top brands, banks & institutions in Bangladesh

 

Why Choose Bhai Bhai Engineering

  • Professional team with proven track record

  • Transparent pricing & reporting

  • Advanced engineering methods

  • 24/7 customer support

  • 100% compliant with BNBC & international standards

 

Contact Us for This Work

Need Fire Safety, AC Piping, or Duct Installation for your building? Our experts are ready to assist you with any commercial, industrial, or institutional project.

Call Us: +880 1722-039029
Email: bhaibhaiengineering@gmail.com

 

Frequently Asked Question-FAQ (Fire Pipe, Valve, AC Piping & Duct Installation)

1. Why is fire pipe installation necessary?

Ans: Fire pipes supply high-pressure water to firefighting equipment. Without this, a building cannot respond to fire emergencies effectively.

2. How long does AC ducting installation take?

Ans: It depends on building size, but most commercial installations take 5–20 days.

3. Do you provide maintenance after installation?

Ans: Yes, Bhai Bhai Engineering provides full AMC & maintenance services.

4. Are your materials certified?

Ans: All pipes, valves, and fittings are approved and standard compliant.

5. Can you handle large commercial projects?

Ans: Yes, we have completed multiple high-rise, banking, and industrial projects in Bangladesh.