Create Support Request

DBL Group (Colour City), Gazipur

Project Information

  • Client:
  • Location:
  • Category:
  • Completion Date:
  • Status: Completed ✅

DBL Group (Colour City) HVAC, Chiller, AHU & Ducting Installation | Bhai Bhai Engineering, Gazipur

Project Name: DBL Group (Colour City) | Project Address: Kasempur, Gazipur
Work Type: 1). Air Conditioning System Installation  2). Chiller Installation  3). Air Piping Installation  4). Ducting Installation  5). AHU (Air Handling Unit) Installation  6). FCU (Fan Coil Unit) Installation  7). Cooling Tower Installation (Completed from Green Tech Service | Sub | Vendor: M/S Bhai Bhai Engineering) | Completion Date: 01.02.2016

This project involved the full installation of an industrial-grade HVAC system including chillers, AHU, FCU, piping, ducting, and cooling towers.
These systems are essential for climate control in textile and manufacturing facilities where machinery generates high heat loads.
The installation ensures stable temperature, enhanced indoor air quality, and improved energy efficiency across the DBL Group Colour City complex.

 

Importance of This Work Type:

For Shopping Malls: 1). Ensures consistent and large-scale cooling for customer comfort.  2). Reduces heat stress in crowded areas.

For Businesses & Corporate Offices: 1). Maintains comfortable workspace climates.  2). Enhances productivity and air quality.

For Industries & Manufacturing Plants: 1). Crucial for machinery cooling and safe production environments.  2). Reduces downtime caused by overheating.

For Banks & Government Offices: 1). Protects sensitive IT and electrical systems from heat.  2). Ensures smooth functioning and a comfortable environment.

For Institutes & Educational Facilities: 1). Maintains clean airflow and stable indoor temperatures.  2). Supports safe and healthy indoor conditions.

 

Why Bhai Bhai Engineering Is Best for This Work Type:

  • Extensive Industrial HVAC Expertise: Successfully completed numerous large-scale HVAC projects across Bangladesh.

  • Certified Technical Team: Skilled professionals trained in chiller, AHU, FCU, ducting, and cooling tower installations.

  • High-Quality Materials & Precision Work: Ensures long-lasting performance and maximum system efficiency.

  • Strong Project Management: Delivers on time while maintaining superior quality and safety standards.

  • Trusted by Major Companies: Repeatedly chosen by top industrial groups and vendors.

 

Why Choose Bhai Bhai Engineering:

  • Proven excellence in complete HVAC system installation for industrial, commercial, and institutional sectors.

  • Customer-focused approach with reliable after-installation service.

  • Competitive pricing without compromising on engineering standards.

  • Commitment to long-term performance, safety, and energy efficiency.

 

Contact Us for This Work Type:

For industrial HVAC, Chiller, AHU, FCU, Piping & Ducting, and Cooling Tower installation, contact Bhai Bhai Engineering:

  • Phone: +8801722039029

  • Email: bhaibhaiengineering51@gmail.com

 

FAQ – HVAC, Chiller, AHU, FCU, Piping & Ducting Installation

1. Why is a complete HVAC system important for industrial facilities like DBL Group?

It maintains optimal temperature for machinery, improves air quality, and ensures worker comfort and production stability.

2. Does Bhai Bhai Engineering handle both installation and maintenance?

Yes, we provide full installation services and offer regular maintenance or AMC (Annual Maintenance Contract).

3. Are cooling towers necessary in large industrial HVAC systems?

Yes, cooling towers remove excess heat and keep HVAC systems running efficiently.

4. Do you work with all types of AC and chiller brands?

Yes, we work with all major HVAC brands available in Bangladesh.

5. Can your team manage large-scale industrial projects?

Absolutely. We specialize in high-capacity HVAC installations for industries, malls, offices, and commercial buildings.

ফোনে সরাসরি কল দিন

WhatsApp এ কল দিন