Project Name: Incepta Pharmaceutical – HVAC & Piping Installation | Location: Shavar, Dhaka | Main Contractor: Aziz & Company Ltd. | Sub Vendor: M/S Bhai Bhai Engineering | Completion Date: 02.05.2010
Bhai Bhai Engineering successfully delivered a high-performance HVAC and insulated piping system designed to meet the strict environmental requirements of pharmaceutical production facilities.
Air Conditioning System Installation: We installed an advanced HVAC system optimized for: 1. Temperature control 2.Humidity management 3.Clean air circulation 4. Pharmaceutical production hygiene standards. This ensures compliance with pharmaceutical manufacturing climate requirements.
Piping Installation with Insulation Accessories: Our team installed a complete insulated piping network that includes: 1. Chilled water piping 2. Copper pipeline installation 3. High-density insulation 4. Moisture and temperature control protection 5. Energy-loss prevention design.
The insulated piping ensures stable temperature and reliability across all HVAC operations.
For Pharmaceuticals: 1. Ensures precise temperature and humidity control 2. Supports sterile production environments 3. Prevents contamination and maintains air quality
For Industries: 1. Protects machinery and equipment from heat 2. Maintains consistent environmental conditions 3. Reduces long-term energy consumption
For Shopping Malls: 1. Ensures customer comfort 2. Enhances indoor air quality 3. Supports long operating hours
For Businesses & Corporate Offices: 1. Improves employee productivity 2. Provides clean and comfortable indoor environments 3. Reduces cooling cost through efficient systems
For Banks: 1. Ensures server room temperature control 2. Improves customer environment 3. Supports uninterrupted operations
For Government Offices: 1. High-traffic area cooling 2. Consistent comfort throughout working hours 3. Cost-efficient and reliable HVAC solution
For All Institutes: 1. Ensures healthy airflow 2. Reduces energy loss 3. Provides stable cooling performance year-round
Experienced in pharmaceutical-standard HVAC installation
Skilled engineers & certified technicians
Completed major projects under Aziz & Company Ltd.
Ensures high-quality insulation & energy-efficient solutions
100% compliance with international HVAC standards
Strong planning, supervision, and on-time project delivery
Proven experience with sensitive and large industrial sites
Leading HVAC & Piping Installation Service Provider in Bangladesh
Specialized in pharmaceutical, industrial, and commercial environments
High-quality materials and professional workmanship
Transparent cost, timely delivery, and reliable installation
Excellent after-installation maintenance and support
For expert Air Conditioning, HVAC, and Piping Installation services: We are ready to support your pharmaceutical or industrial project with precision and professionalism.
Call Us: +8801722039029
Email: bhaibhaiengineering51@gmail.com
1. Do you provide HVAC solutions for pharmaceutical companies?
Ans: Yes. We specialize in HVAC and piping systems designed for pharmaceutical and controlled environments.
2. Can you handle large-scale industrial and commercial HVAC projects?
Ans: Absolutely. Our team has completed HVAC projects for banks, factories, malls, and corporate buildings across Bangladesh.
3. Do you offer after-installation support?
Ans: Yes. We provide maintenance services, system checks, and annual maintenance contracts (AMC).
4. Why is proper insulation important for HVAC systems?
Ans: Good insulation prevents energy loss, maintains temperature stability, and increases system lifespan.
5. How long do installation projects typically take?
Ans: Time varies based on size and scope, but we always ensure safe, compliant, and timely completion.