Create Support Request

Siddirganj 350 MW Power Plant – Air Conditioning & Ventilation Works

Project Information

  • Client:
  • Location:
  • Category:
  • Completion Date:
  • Status: Completed ✅

Siddirganj 350 MW Power Plant – AC BRF, Exhaust & Ventilation Duct Project | Bhai Bhai Engineering

Bhai Bhai Engineering is proud to have successfully completed the full Air Conditioning BRF System, Exhaust Duct Installation, and Ventilation Duct System at the Siddirganj 350 MW Power Plant, located in Siddirganj, Narayanganj, Dhaka. This project was executed as a Sub-Vendor under Innova Engineering, ensuring high technical standards and proper safety compliance throughout the entire installation process.
The project was officially completed on 20.05.2014, marking another milestone for Bhai Bhai Engineering in delivering reliable HVAC and industrial air handling solutions.

Our work included precise BRF system installation, mechanical duct fabrication, exhaust duct setup, and ventilation systems designed to support continuous operations inside a large-scale power plant environment. Every section of the installation followed strict engineering guidelines to ensure maximum cooling efficiency, proper air flow, and long-term durability.

Air Conditioning BRF Installation: 1). Energy-efficient cooling system  2). Stable performance for large industrial spaces  3). Low maintenance and long life cycle

Exhaust Duct Installation:  1). Removes harmful fumes and hot air  2). Supports safe working conditions  3). Protects machinery from overheating

Ventilation Duct System: 1). Ensures continuous fresh air  2). Maintains temperature balance  3). Enhances worker safety and comfort

Importance of This Work Type for Different Sectors

Shopping Malls: 1). Keeps indoor temperature stable  2). Ensures customer comfort  3). Reduces energy consumption

Corporate & Business Buildings: 1). Improves working environment  2). Supports long operation hours  3). Enhances HVAC system efficiency

Industries & Factories: 1). Essential for safety  2). Removes toxic or heated air  3). Maintains production performance

Banks & Commercial Offices: 1). Ensures a clean, cool environment  2). Supports electronic equipment life

Government Offices & Institutions: 1). Reliable air-flow for high-traffic spaces  2). Maintains comfort in administrative areas

 

Why Bhai Bhai Engineering Is the Best for This Work Type

1. Skilled HVAC & Ducting Team
2. High-quality materials & fabrication
3. Strict safety and compliance standards
4. Timely project delivery
5. Experience in power plants, industries, and large facilities
6. Cost-effective and long-lasting solutions

 

Why Choose Bhai Bhai Engineering?

  • Over a decade of technical expertise

  • Proven track record across Bangladesh

  • Strong vendor and subcontractor partnerships

  • Professional installation with zero compromise

  • Support, inspection, and after-installation services

 

Contact Us for This Work Type

Looking to install AC BRF, Exhaust Duct, or Ventilation Systems for your power plant, industry, commercial building, or institution?
Bhai Bhai Engineering is ready to help.

phone: +8801722039029
Email: bhaibhaiengineering51@gmail.com

 

Frequently Asked Questions(FAQ) 

1. Do you provide installation for both BRF and ventilation systems?

Ans: Yes, our team handles BRF, VRF, ducting, ventilation, and complete HVAC projects.

2. Can you work as a sub-vendor?

Ans: Absolutely. We have years of experience collaborating with main vendors and engineering firms.

3. Do you follow power plant safety standards?

Ans: Yes. We strictly follow industrial safety guidelines, PPE rules, and compliance procedures.

4. Do you provide maintenance after installation?

Ans: Yes, we offer AMC and regular service support.

5. Can you work outside Dhaka?

Ans: Of course. We provide services all over Bangladesh.

ফোনে সরাসরি কল দিন

WhatsApp এ কল দিন