The project covered a complete HVAC setup including: 1). Central Air Conditioning System 2). Industrial Chiller installation 3). HVAC Piping (Chilled Water Line & Condenser Line) 4). AHU (Air Handling Unit) installation 5). Commissioning & performance check 6). Safety and insulation work 7). System balancing and airflow testing. This HVAC setup ensures uniform cooling, supports high-volume garment production, reduces heat load generated by machinery, and maintains proper air circulation inside the factory.
Shopping Malls: 1). Ensures shopper comfort 2). Keeps indoor climate stable 3). Reduces humidity levels
Corporate Businesses: 1). Maintains productive work environment 2). Protects sensitive equipment
Industries & Factories: 1). Controls heat generated by heavy machinery 2). Improves worker efficiency 3). Ensures safe airflow
Banks: 1). Keeps server rooms cool 2). Improves customer comfort
Government Offices: Ensures stable Air Conditioning during long operational hours
Educational & Institutional Buildings: 1). Maintains healthy indoor air quality 2). Supports large gatherings
HVAC & Chiller systems are essential for safety, comfort, and operational quality in all types of facilities.
Bhai Bhai Engineering stands out because:
Over 12+ years of experience in industrial HVAC
Successfully completed over 500+ AC & Chiller projects
Skilled engineering team
High-quality installation with international standards
Strong safety practices
On-time project delivery
Affordable project cost with guaranteed performance
We deliver long-lasting HVAC solutions
24/7 technical support available
Genuine materials and branded equipment
Expertise in industrial-grade AC and Chiller systems
Excellent track record in garments, industries & commercial projects
When reliability matters, Bhai Bhai Engineering is the right choice.
For Air Conditioning, Chiller Installation, Piping, and AHU Setup. We provide free consultation and project assessment.
Phpne: +8801722039029
Email: bhaibhaiengineering51@gmail.com
1. What type of HVAC services do you provide?
Ans: We provide AC installation, Chiller installation, ducting, piping, AHU installation, VRF, and ventilation systems.
2. Do you work with garment factories and industries?
Ans: Yes, we specialize in large-scale industrial HVAC systems for garments, textile mills, production plants, and warehouses.
3. How long does it take to install a chiller system?
Ans: Installation time varies by capacity, but most systems take 2–6 weeks, including testing.
4. Do you offer maintenance service?
Ans: Yes. We provide monthly, quarterly, and annual maintenance packages.
5. Can you handle full project implementation?
Ans: Yes, we handle design, installation, commissioning, testing, and handover.