Create Support Request

United Head Office Center Point – Air Conditioning & Chiller Installation Project

Project Information

  • Client:
  • Location:
  • Category:
  • Completion Date:
  • Status: Completed ✅

United Head Office Center Point AC & Chiller Installation | Bhai Bhai Engineering | Gulshan-2 Project

Bhai Bhai Engineering proudly completed the full-scale Air Conditioning, Chiller Installation, Piping, FCU, and AHU Installation works at the United Head Office Center Point, Gulshan-2, Dhaka. Executed under Aziz & Company Ltd., our team worked as a reliable Sub-Vendor, delivering world-class HVAC solutions that ensure comfort, energy efficiency, and long-term performance.
The project, successfully completed on 20.05.2014, involved advanced engineering, accurate alignment, and fully compliant mechanical installation to maintain perfect indoor air quality and cooling efficiency for a premium corporate environment.

 

Air Conditioning System Installation

Installation of central AC systems to maintain controlled indoor temperatures and ensure optimum comfort for all floors.

Chiller System Installation: High-capacity chiller plants installed with precision to support the entire building’s cooling load.

Piping & Mechanical Works: Durable insulated piping, chilled water lines, copper piping, and structure-safe mechanical routing.

FCU (Fan Coil Unit) Installation: Energy-efficient FCU units installed for floor-wise temperature zoning.

AHU (Air Handling Unit) Installation: AHUs installed for centralized ventilation, air filtering, and humidity control.

 

Importance of This Work Type for Different Sectors

Shopping Malls: Ensures temperature stability, customer comfort, and fresh air quality.

Corporate Offices & Business Centers: Boosts productivity by maintaining a comfortable, noise-free cooling environment.

Industries & Factories: Maintains machinery-safe temperature and ensures worker safety.

Banks & Financial Institutions: Maintains uninterrupted operational climate and prevents overheating of equipment.

Government Offices & Institutions: Ensures stable environmental conditions for sensitive operations, data centers, and administrative tasks.

All Types of Institutes: Improves comfort, indoor quality, and energy efficiency for daily operations.

 

Why Bhai Bhai Engineering Is the Best for This Work Type

1). More than 15+ years of experience in HVAC solutions  2). Certified engineers and trained technicians 3). Strong portfolio of corporate, industrial & mega-projects  4). Accurate installation following international standards  5). Commitment to safety, durability, and energy savings  6). Proven reliability as Sub-Vendor for top companies

 

Why Choose Bhai Bhai Engineering

1). Timely project completion  2). Premium-grade materials and equipment  3). Zero-compromise quality policy  4). Transparent cost and professional service  5). Long-term support & maintenance  6). Customer-first approach

 

Contact Us for This Work Type

If you need Air Conditioning, Chiller Installation, Piping, FCU, or AHU work for your building, office, industry, or commercial space:

Phone: +8801722039029
Email: bhaibhaiengineering51@gmail.com

Our expert HVAC team is ready to support you.

 

Frequently Asked Questions(FAQ) – Air Conditioning & Chiller Installation Work

1. How long does a full HVAC installation usually take?

Ans: It depends on building size and system type. Most commercial projects take 1–3 months.

2. Do you provide maintenance after installation?

Ans: Yes. We provide AMC (Annual Maintenance Contract) and on-demand servicing.

3. What brands do you work with?

Ans: We work with all top HVAC brands including Carrier, York, Trane, LG, and others.

4. Can you handle both small and large projects?

Ans: Absolutely. We have experience in industrial, commercial, and mega-project HVAC systems.

5. Do you provide warranty for your installation?

Ans: Yes. We offer a service warranty on installation quality.

ফোনে সরাসরি কল দিন

WhatsApp এ কল দিন